Lisbon Undergroung – Circle Line

Lisbon - Portugal

Transport | Metros and Light Railway | Project Management and Works Supervision

Lisbon Undergroung – Circle Line

Client: Metro de Lisboa, S.A.

Period: 2020 - 2024

Description:

Project description:

This Project includes the extension of the Yellow Line between Rato station and Cais do Sodré station, in an extension of about 1 984 m and along a 52-meter slope, in a double-track tunnel with a 48 m² section, executed by the NATM method and, in the final section connecting to Cais do Sodré, by ‘cut-and-cover’. Also included are the construction of 2 new stations – Estrela (at a depth of 54 m) and Santos (at a depth of 24 m), 2 new mid-section ventilation shafts, the creation of a second atrium at the Cais do Sodré station connecting to the railway station, remodeling the ventilation shaft at the Rato station (40 meters deep) and creating a connection between the Yellow Line and Green Line viaducts at the Campo Grande station.

Project value: € 230 000 000

Scope of services: CONSULGAL created an ACE for the Coordination, Supervision, Quality Management, Safety and Environmental Monitoring of the Works, including planning control, cost control, risk management supervision, topographic control supervision, interface management, among others.