Client: Companhia do Metropolitano de São Paulo - METRÔ
Period: 2013 - 2017
Description:The expansion of Line 5 (Lilac) made it possible to connect Largo Treze to Chacara Klabin, developing in an 11.5 km long tunnel through which 26 new vehicles circulate. 11 new underground stations, 13 emergency exits/ventilation shafts, 1 parking lot for rolling stock and 1 PMO for heavy maintenance were built. The energization of the section was ensured by 1 primary substation, also built. The 2nd phase of the construction of Line 4 (Yellow) comprised the construction of new accesses, civil works completion and the installation of equipment at the São Paulo-Morumbi, Fradique Coutinho, Oscar Freire and Higienópolis-Mackenzie stations. A new station and its accesses were also built at this stage – Vila Sônia Station, including a tunnel section of about 1.5 km in length to allow the connection to the new station.
Project value: € 1 349 446 900
Scope of services: Management of the detailed design and homologation of the permanent track, including, among others, general coordination, Analysis and Validation of the Architecture, Finishing, Visual Communication, Urbanization, Landscaping, Civil Engineering of Gross Works and Superstructure of Permanent Way detailed designs, monitoring and critical analysis of neighboring buildings mapping and of field tests results, analysis of the laboratory approval test results of systems, components and materials.