Boaventura – São Vicente Expressway
Madeira - Portugal
Boaventura – São Vicente Expressway
Client: Estradas da Madeira (RAMEDM)
Period: 2008 - 2018
Description:The undertaking was part of the project to modernize the Road Network in the Autonomous Region of Madeira. With a total length of about 7.1 km, its location on the island’s North coast, a region of challenging orography, has led to most of the length of the route being developed at high altitude and inclination and along 4 tunnels of 1 100 m, 1 117 m, 1 750 m and 2 400 m, with 7 emergency galleries with lengths between 92 m and 557 m.
Undertaking value: € 67 807 000
Scope of work: Assistance for Works supervision, including the creation of tools to allow the control of works at different levels with a special focus on quality control of works execution, work program control, financial control, as well as control of safety conditions on site.