Madeira Airport Runway Expansion Joints Replacement

Madeira - Portugal

Transport | Airports | Project Management and Works Supervision

Madeira Airport Runway Expansion Joints Replacement

Client: ANA – AEROPORTOS DE PORTUGAL, S.A.

Period: 01/2022 – 09/2022

Description:

Interventions in the expansion joints CAB24, CAB23 and R4-700 of the Madeira Airport Runway with the aim of prolonging their useful life. The works involve the replacement of damaged neoprene modules, anti-corrosive treatment of the reinforcement plates of the joints, anti-corrosive treatment of the plates of the main joint, repair of degraded elements (transition bands, fixing bolts, sealing of sockets). Work takes place outside airport operating hours.

Project value: € 592 877

Scope of services: Coordination and management of the work, technical inspection, quality control, environmental inspection, cost control and contract execution progress control, planning and cost control and safety coordination on site.